Project Details
Ptli Layers
Type
Factory Automation
Ptlico Location
Location
Yatala
Ptlico User
Industry
Construction
Ptlico Setting
Scope of work
Automation

About This Project

Fulton Hogan is a large infrastructure construction, roadworks and aggregate supplier company. In 1933, Jules Fulton and Bob Hogan teamed up to form Fulton Hogan. From there, they’ve grown to over 7000 people.

Fulton Hogan embarked on upgrading their existing Emulsion storage tank system. Industrial Power and Automation was tasked with the automation of this project.

This project consisted of:

  • Automation and control of Emulsion system based on detailed functional description
  • PLC/HMI programming and commissioning
  • Conduct a Factory Acceptance Test (FAT)
  • On-site commissioning, IO testing, and validation of equipment

Project Gallery

Have an enquiry relating to a project?
Fill out this form and we’ll be in touch
Ptli Fill Form Bg Illustration
Ptli Fill Form Img
This field is for validation purposes and should be left unchanged.
Hi Form Line Bg (1)
Sign up to receive our insights

"*" indicates required fields

This field is for validation purposes and should be left unchanged.
Logo

Share This

Select your desired option below to share a direct link to this page.
Your friends or family will thank you later.