About This Project
Industrial Power and Automation was tasked with the electrical installation of a new hydraulic bin lifter.
Â
 This project consisted of:
- 1x 3 phase power supply to control panel
- 1x 3 phase hydraulic pump
- 2x Limit switches
- Installation of hygienic cable management system
- Modification of control panel to suit operational requirements